⭐ 4.9/5 · 143 Reviews — Exactly what a Leicester landlord must do about the roof in 2026 — the three laws that apply, and the honest position on Awaab's Law and private lets.
Tell us the job in 30 seconds. No pushy sales, no call-out fee.
๐ Call Now: 0116 319 1348Most Leicester roof problems announce themselves the same way — a damp patch, a dropped tile, or debris in the garden after wind. Here is how to tell a repair from something bigger.
When it is not the answer: If more than about a third of the covering has failed, or the fixing nails across a whole slope are corroding, repairing tile-by-tile is money wasted Read the full guide.
We inspect the roof from ground and loft, and by drone where close access helps, to pin down the exact fault — not just the symptom.
You get a fixed written price within 48 hours, each element listed separately so you can see what you are paying for.
Most repairs are booked within one to two weeks; genuine emergencies are same-day.
We carry out the work, matching tiles and using correct lead and lime mortar on period stock.
We clear all debris, leave the site tidy, and hand over the written workmanship guarantee.
| Job | Typical duration |
|---|---|
| Slipped or cracked tiles | 1–2 hours |
| Chimney flashing repair | half a day |
| Single lead valley re-run | 1–2 days |
| Full ridge & hip re-bed | 1–2 days |
| Slope re-nail (nail sickness) | 1–3 days |
Wet or high-wind days pause tiling and lead work — we build weather margin into every booking so a forecast does not leave your roof open.
Most Leicester repairs run from a tower or roof ladder; scaffold is quoted only where the job needs safe standing time at height. Scaffold is specified for: chimney-side repairs, full valley rebuilds, three-storey terraces, and anything beyond a day at height - always itemised in your written quote, never a hidden extra, and we arrange it.
Victorian terraces in Highfields and Belgrave mean rear-access scaffold and permit-controlled pavement space; the open post-war estates at Braunstone and Thurmaston are more straightforward to scaffold. Pavement scaffold and skip permits go through Leicester City Council; allow a few working days on streets like East Park Road, Narborough Road, the terraced streets off London Road where space is tight.
| Job | Typical range | Notes |
|---|---|---|
| Slipped or cracked tiles | £150–£400 | Per visit, incl. access |
| Chimney flashing repair | £200–£600 | Depends on flashing run |
| Single lead valley re-run | £400–£700 | Code 4–5 milled lead |
| Full ridge & hip re-bed | £500–£900 | Or dry-fix upgrade |
| Slope re-nail (nail sickness) | £300–£1,400 | Single slope to full |
Worked example: A 1930s semi in Wigston — three cracked tiles replaced, the front ridge re-bedded and a chimney apron flashing renewed — typically £550–£750, done in a day from tower access.
No deposit on repairs under £500. Larger repairs are paid on completion, nothing up front before materials are on site.
Covering LE1, LE2, LE3, LE4, LE5 and surrounding postcodes.
Workmanship on the repaired section is covered for 10 years in writing; any replacement tiles and lead carry their manufacturer warranties on top.
If a fault appears in covered work, we come back and put it right. No quibbling, no re-charge.
A day of ladder or tower work and a small amount of tile debris — we sheet below the work area and clear everything before we leave. You do not need to stay home for external work - we just need power and access agreed in advance.
Repairs run year-round; temporary weatherproofing goes on the same day if rain stops work mid-job. Leicesterโs inland Midlands position means wind-driven rain is the main roofing stress rather than coastal salt.
Roof repair responsibility in a Leicester rental is not a grey area — it sits squarely with the landlord, and three pieces of legislation define the shape of that duty. Knowing exactly what applies now, and what is coming, protects you from both unexpected liability and unnecessary worry.
1. Landlord and Tenant Act 1985, section 11. This is the foundation. It implies into virtually every residential tenancy a landlord duty to keep in repair the structure and exterior of the dwelling. The roof, the gutters, the external pipes — all structure and exterior. The duty is automatic and cannot be excluded by anything written into the tenancy agreement. If the roof leaks, fixing it is your job, full stop.
2. Homes (Fitness for Human Habitation) Act 2018. This Act gave tenants a direct route to court where a property is unfit for habitation — and serious roof-related damp and mould is a classic route to unfitness. Before 2018 a tenant largely depended on the council to enforce standards; now they can act themselves. For landlords, that raises the cost of ignoring a roof problem.
3. Awaab's Law. Named after Awaab Ishak, whose death from prolonged mould exposure exposed catastrophic failings, Awaab's Law sets strict statutory timescales for investigating and fixing damp, mould and emergency hazards. It has applied to social housing in England since 27 October 2025.
Under section 11 of the Landlord and Tenant Act 1985, the landlord's obligation to keep the structure and exterior in repair cannot be excluded or limited by the tenancy agreement except with the leave of the court. Source: Landlord and Tenant Act 1985, s.11
Here is the point that causes the most confusion, so let us be precise. As of 2026, Awaab's Law does not yet apply to private landlords. It applies to registered social housing providers only.
The Renters' Rights Act 2025 — which received Royal Assent in October 2025 and whose first major phase went live on 1 May 2026 — contains the legal power to extend Awaab's Law to the private rented sector. But extending it requires separate secondary legislation, preceded by a government consultation on the detail and timescales. That consultation had not concluded and no commencement date for the private sector had been confirmed at the time of writing. Commentary from housing bodies suggests it is unlikely to be immediate, with the main Renters' Rights Act reforms bedding in first.
What does the private-sector version look like when it arrives? The social-housing template is the strong signal: fixed timescales such as 24 hours for emergency hazards, short windows to investigate damp and mould, and a written summary to the tenant. The exact figures will be set by the regulations. The sensible landlord response is to prepare now — treat roof-sourced damp and leaks as urgent, keep good records, and build a fast-response relationship with a roofer.
As of 2026, Awaab's Law applies only to social housing; the Renters' Rights Act 2025 provides the power to extend it to the private rented sector, but the start date is subject to consultation and has not been confirmed. Source: Renters' Rights Act 2025 implementation roadmap (GOV.UK)
Whatever the exact statutory timescale, the practical duty is the same: act within a reasonable time, and treat active water ingress as urgent. A sound sequence for a Leicester landlord: acknowledge the report the same day and log the date; arrange a prompt inspection; make safe and weatherproof to stop further damage; carry out the permanent repair; and keep the tenant informed throughout, documenting each step with dates and photographs.
This is exactly the workflow Awaab's Law is designed to compel, so a landlord who already responds this way has little to fear from its extension. We offer Leicester landlords and letting agents a priority response for tenanted properties, coordinate access with tenants, and provide the dated photographs and itemised invoices that make your compliance provable. See our landlord roofing hub for the full service, and our guides on roof-sourced damp and mould and between-tenancy maintenance.
The landlord. Section 11 of the Landlord and Tenant Act 1985 places the duty to keep the structure and exterior — including the roof — in repair on the landlord, and this cannot be shifted to the tenant by the tenancy agreement. The tenant's duty is to report problems promptly and allow access.
Not yet. Awaab's Law has applied to social housing since 27 October 2025, and the Renters' Rights Act 2025 contains the power to extend it to private landlords — but that extension needs separate regulations and a consultation, and no commencement date for the private rented sector has been confirmed as of 2026. Existing duties under the Homes (Fitness) Act 2018 and section 11 already apply, however.
There is no single statutory number for private lets yet, but the duty is to act within a reasonable time, and active water ingress is urgent. Once Awaab's Law extends to the private sector it is expected to bring social-housing-style timescales — broadly 24 hours for emergencies and short fixed windows to investigate damp and mould. Acting fast now is both good practice and good preparation.
Withholding rent is risky and can lead to eviction, so tenants are generally advised against it. The proper routes are to report in writing, escalate to the council's environmental health team, or take action under the Homes (Fitness for Human Habitation) Act 2018. Landlords avoid all of this by responding to roof reports promptly.
Dated tenant reports, dated photographs before and after, itemised VAT invoices, and the written guarantee. This paperwork evidences a prompt, reasonable response — valuable for any dispute, for tax, and for demonstrating the standard Awaab's Law will expect once it reaches the private sector.
It depends on whether HMRC treats the work as a repair (usually a deductible revenue expense) or a capital improvement. Re-roofing can fall either way on the facts. We provide clearly-described itemised invoices, but the categorisation is a matter for your accountant — please confirm with them.
Acknowledge it the same day and log the date, arrange a prompt inspection treating active ingress as urgent, make safe and weatherproof to stop further damage, then carry out the permanent repair — keeping the tenant informed and documenting each step.
Priority response for tenanted properties, itemised invoices for your records, and coordination with your tenant or agent.
0116 319 1348 📅 Get My Free Quote